Installation Instructions: Heat Metering; Heat Metering - Baxi LUNA SAT RCZ G1-MB Installation And Operating Manual

Built-in user modules, m-bus models transmission of consumption via cable
Table of Contents

Advertisement

Available languages

Available languages

The modules are supplied standard with a ZENNER ZELSIUS C5 (M-BUS) electronic heat meter.
This device measures heat consumption in the zone controlled by the user module.
The electronic unit features an LCD display. A button for querying the appliance is located on the front of the display.
The appliance can be turned by 360° and inclined by 90°.
The appliance display has four data levels which may be viewed as described below:
Level 1
H
Heat energy
(Main display)
1
Cooling energy
1
2
3
4
Segment test
1
Date last due date
1
Energy
Last due date
1
Due date cooling energy
Volume
Flow rate
Supply temperature
Return temperature
Temperature difference
Current output
S
INSTALLATION AND OPERATING MANUAL
INSTALLATION INSTRUCTIONS:

HEAT METERING

11. HEAT METERING
Level 2
2
H
Heat energy difference from
last due date to now
2
Cooling energy difference
from last due date to now
Heat energy difference from
1. this month to now
2
Cooling energy difference from
1. this month to now
2
Volume difference from
1. this month to now
2
Maximal Flow
2
Date month maximal
flow
2
Maximum power, Average value
since commissioning
2
Maximum heat energy
power month
2
Maximum cooling energy power,
average value since commissioning
2
Maximum cooling energy
power month
S
Important Note:
Devices, which are in sleep mode (Display:
SLEEP 1) have to be activated through keypress
until the energy display shows up.
Depending on you meter's modelits displays can
differ in number and order from those shown
here.
45
7215037.01 - en

Advertisement

Chapters

Table of Contents
loading

Table of Contents