Start-Up And Operating Instructions; Filling The System; Operating Procedure - Baxi LUNA SAT RCZ G1-MB Installation And Operating Manual

Built-in user modules, m-bus models transmission of consumption via cable
Table of Contents

Advertisement

Available languages

Available languages

START-UP AND OPERATING INSTRUCTIONS

13. FILLING THE SYSTEM

Before starting the user module, open the on/off valves on the hydraulic connectors and check the system filling pressure
in the boiler room and distribution columns (< 3 bar).
The centralised plant must have an automatic filling device.

14. OPERATING PROCEDURE

14.1 STARTING
To start the appliance correctly, proceed as follows:
• Power the module.
• Check that the system is full and at the right pressure (see § 13) and temperature (65 ÷ 75°C).
• Press the luminous switch on the cover of the electrical box.
• Adjust the ambient thermostat to the required temperature.
Following a heat demand from the ambient thermostat, the water from the centralised system begins to circulate in the
heating elements of the zone controlled by the user module.
14.2 PARTIAL SHUT-DOWN
Adjust the ambient thermostat / heating programmer to disable the heating function (lower the set ambient temperature).
14.3 TOTAL SHUT-DOWN
Disconnect the appliance from the power supply by turning the luminous switch and the two-pole switch
INSTALLATION AND OPERATING MANUAL
7215037.01 - en
53

Advertisement

Chapters

Table of Contents
loading

Table of Contents