After having completed the masonry work, fix the LUNA SAT module appliance inside the template box and make the
hydraulic connections (see Figure 3).
Before fixing the module, make the holes in the back wall to insert the Ø 10mm fixtures (use the holes in the template box
as a guide). Then secure the module with the supplied screws.
Figure 3: Connectors and dimensions LUNA SAT RPZ – SP + 2C
Key
CENTRALISED PLANT CONNECTIONS
IP: primary inlet from centralised plant G 3⁄4" M
UP: primary outlet to centralised plant G 3⁄4"M
HEATING PLANT CONNECTIONS
MR: heating flow G 3⁄4" M
RR: heating circuit return G 3⁄4" M
DOMESTIC COLD WATER CONSUMPTION METER CONNECTIONS
EAFS: domestic cold water inlet G 3/4" M (or system filling if the meter is not fitted)
UAFS: G 3/4" M cold domestic water outlet
DHW CONSUMPTION METER CONNECTIONS:
EACS: domestic hot water inlet G 3/4" M
UACS: Hot domestic water inlet G3/4'' M
INSTALLATION AND OPERATING MANUAL
5. MOUNTING THE APPLIANCE
VIEW FROM ABOVE
Fixing slots
Seats for screws
Kit L 600
Kit D 150
VIEW FROM
BELOW
38
7224230.02 - en