Mounting The Appliance - Baxi LUNA SAT RCZ-MB Installation And Operating Manual

Built-in user modules
Table of Contents

Advertisement

Available languages

Available languages

After completing the masonry work, insert the LUNA SAT module into the casing/template and fix it to the connectors of
the four taps inside the casing/template.
Secure the electrical box to the bracket on the casing with the supplied nut.
110
IP
UP
EC
1
EC
2
Figure 4: Connectors and sizes
Key
CONNECTIONS TO CENTRALISED PLANT
IP:
primary inlet from centralised plant G 3 ⁄ 4" M
UP:
primary outlet from centralised plant G 3 ⁄ 4" M
HEATING PLANT CONNECTIONS FOR SINGLE-ZONE MODELS
MR:
heating plant delivery G 3/4" M
RR:
heating plant return G 3/4" M
DOMESTIC WATER METER CONNECTIONS
EC1:
Domestic water inlet to meter G 3/4"
EC2:
Domestic water inlet to second meter G 3/4"
UC1:
Domestic water outlet from meter G 3/4" M
UC2:
Domestic water outlet from second meter G 3/4" M
AE:
Hole for cables
INSTALLATION AND OPERATING MANUAL

5. MOUNTING THE APPLIANCE

65
318
164
15
450
42
AE
65
15
65
37
77
33
MR
RR
UC
1
UC
2
CR_0616
1403_3102
7213763.01 - en

Advertisement

Chapters

Table of Contents
loading

Table of Contents