Midea MFEP26VA-N User Manual page 20

Table of Contents

Advertisement

Wrap piping & Cables
5
NOTE
Before passing the piping, and drain hose and the signal cable through the wall hole, you must bundle
them together to save space, protect them, and insulate them.
Indoor Unit
Signal
wire
Drain hose
Wrap with
Vinyl tape
insulation tape
(narrow)
Pipe
Drain hose
DRAIN HOSE MUST BE ON BOTTOM
Make sure that the drain hose is at the bottom of the bundle. Putting the drain hose at the top of the bundle
can cause the drain pan to overflow, which can lead to fire or water damage.
DO NOT WRAP ENDS OF PIPING
When wrapping the bundle, keep the ends of the piping unwrapped. You need to access them to test for
leaks at the end of the installation process (refer to Electrical Checks and Leak Checks section of this
manual).
Step 1:
Bundle the drain hose, refrigerant pipes, and signal
cable as shown in the figure(Not applicable for some
Space behind
locations in North America ).
unit
Refrigerant
piping
Insulation
tape
Step 2:
Using adhesive vinyl tape, attach the drain hose to
the underside of the refrigerant pipes.
Step 3:
Using insulation tape, wrap the refrigerant pipes,
signal wire and drain hose tightly together.
Double-check that all items are bundled.
Do not intertwine signal calbe with
other wires
While bundling these items together,do not intertwine
or cross the signal cable with any other wiring.
18

Advertisement

Table of Contents
loading

Table of Contents