Pre-Operation Inspection And Service - Schulte GX-130 Operator's Manual

Table of Contents

Advertisement

8. PRE-OPERATION INSPECTION AND SERVICE

Before each use, a pre-operation inspection and service of the implement and tractor must be performed. This
includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped and
functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection reveals
any condition affecting safe operation. Perform repairs and replacement of damaged and missing parts as
soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time and
repair cost can be avoided. OPS-U-0029str
Always disconnect the main PTO Driveline from the Tractor before performing service on the
Implement.
running. Rotating Parts, Blades or Drivelines could turn without warning and cause
immediate entanglement, injury or death.
DO NOT allow any person under a folded wing unless wing is securely
locked up or supported. DO NOT approach the Implement unless the
Tractor is turned off and all motion has ceased. Never work under the
frame work, or any lifted component unless the implement is securely
supported or blocked up. A sudden or inadvertent fall by any of these
components could cause serious injury or even death.
Periodically inspect all moving parts for wear and replace when necessary
with authorized service parts. Look for loose fasteners, worn or broken
parts, and leaky or loose fittings. Make sure all pins have cotter pins and
washers. Serious injury may occur from not maintaining this machine in
good working order.
GX-130 04/23
© 2023 Alamo Group Inc.
OPERATION
Never work on the Implement with the tractor PTO driveline connected and
(SG-21 )str
Operation Section 4-17
(S3PT-11)str
(STI-03) str

Advertisement

Table of Contents
loading

Table of Contents