NOTES:
9
IQ7+/IQ7X/IQ7A Microinverters Installation and Operation Manual
When looping the IQ Cable, do not form loops smaller than 4.75" (12 cm) in
diameter.
Provide support for the IQ Cable every 1.8 m (6 feet).
If you need to remove a sealing cap, you must use the IQ Disconnect Tool.
When installing the IQ Cable and accessories, adhere to the following:
Do not expose the terminator cap or cable connections to directed,
pressurized liquid (water jets, and so on).
Do not expose the terminator or cable to continuous immersion.
Do not expose the terminator cap or cable connections to continuous
tension (for example, tension due to pulling or bending the cable near the
connection).
Use only the connectors provided.
Do not allow contamination or debris in the connectors.
Use the terminator cap and cable connections only when all parts are
present and intact.
Do not install or use in potentially explosive environments.
Do not allow the terminator to come into contact with an open flame.
Fit the terminator cap using only the prescribed tools and in the
prescribed manner.
Use the terminator to seal the conductor end of the IQ Cable; no other
method is allowed.