Main Specifications : Overall assembled size : W9.15 x L11.97 x H3.0 (m) / 30 x 39.27 x 9.84(ft) Ridge Peak Height : 3 m / 9.84ft + container height Prior to assembly Please read the instructions carefully before installation. It is very important to follow your local safety regulations and industry standards during installation.
Page 3
(picture1) Structure diagram ▶ W W W . T M G I N D U S T R I A L . C O M P 2 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
Page 4
TMG-ST3041CVF Part List Picture Description Length Quantity Peak arch tube L1734mm Middle rafter tube L2890mm Middle rafter tube L2890mm Shoulder tube L1784mm Shoulder tube L1784mm Middle truss base plate W150xL200mm Left corner base plate W150xL200mm (front and rear truss) Right corner base plate...
Page 5
cross-draw tube L2313mm (For front arch pipe) vertical tube L590mm (For front arch pipe) Sidewall frame steel L1300mm tension cables Ratchet Ratchet straps W38xL800mm Mounting base W40xL100mm φ 42 Tube clamp φ 58 Tube clamp Top cover tension tube L1993mm (for both bottom sides) Top cover tension tube L490mm...
Page 7
Step 2 : Place the containers making sure they are parallel and the correct width apart. Make sure there is a gap of about 3 feet around the building. the center point of the round pipe of the base is the reference point, and the diagonal X and Y must be equal.
Page 8
Step 3 : Connect all trusses. Front trusses (1trusses). Part Part ▶ W W W . T M G I N D U S T R I A L . C O M P 7 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
Page 9
Front and rear trusses (3trusses). Part Part ▶ W W W . T M G I N D U S T R I A L . C O M P 8 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
Page 10
Middle trusses (6 trusses). Part Part ▶ W W W . T M G I N D U S T R I A L . C O M P 9 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
Page 11
Lay down all (10) trusses on the ground when the assembly is all completed and before moving to next step, and then wrap (#15) around the sharp points of the joint to avoid friction between the fabric and the interface, resulting in fabric damage. Part ▶...
Page 12
Step 4 : Put up all trusses. Install each truss on the base tube. Use hex bolt (#11) to secure the truss to the base tube firmly. We recommend to use a crane or forklift to lift the truss and have 2 to 3 people on site to work together.
Page 13
Step 5 : Install cross tubes and wire ropes. Part Part ▶ W W W . T M G I N D U S T R I A L . C O M P 1 2 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
Page 14
Step 6 : Install the remaining parts on the rear truss. Part Part ▶ W W W . T M G I N D U S T R I A L . C O M P 1 3 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
Page 15
Overall structural inspection : Check all components and trusses to ensure the entire structure is rectangular as specified in (picture1). All trusses must be 90 degrees straight up from the container. Secure and tighten all bolts and nuts on this step. But do not over tie! Otherwise you might damage the tubes or components.
Page 16
Step 8 : Install rear cover panel What you see in this picture is the inside! Lift up (#23) cover panels, starting from the center point of the frame (highest ridge point) use ropes (#19) through the grommets to tie the panel to the truss firmly. All grommets need to be tied to the frame.
Page 17
Step 9 : Install the top cover (#18) stretch and tighten top cover. Do not install the cover during windy weather! Stretch and adjust the cover from back and forth, to make sure it is square and centered. Unpack the top cover and place it along one of the long sides of the structure.
Page 18
Part Rope Shear Size ▶ W W W . T M G I N D U S T R I A L . C O M P 1 7 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
Page 19
Step 10 : Tension the cover on the structure from both sides. Insert tension tubes (#9) slowly into the bottom groove pocket on both long sides. Add the water plug (#21) on the first tension tube to avoid tearing the fabric and add one to the end of last tube as well.
Page 20
Step 11 : Install ratchet straps. Stretch and adjust the cover from left and right, back and forth, to make sure it is square and centered. Cut the groove pocket where it aligns with ratchet (#7A), and use strap (#7B) to pull tension tube (#9) to ward the ratchet and secure it.
After Installation Walk around and inspect the building periodically to make sure the parts are firmly fixed and the whole building is well supported. Check all bolts and hardware connectors to make sure they are in place and tightened. Check the base plates, adjust the ropes if necessary and clean the cover regularly.