Unigas LMV5 Series Manual Of Installation - Use - Maintenance page 19

Microprocessor controlled gas - light oil burners
Table of Contents

Advertisement

PART II: INSTALLATION
Threaded train with MultiBloc MBE - Mounting
1. Insert studs A.
B
2. Insert seals B.
3. Insert studs C.
B
C
4. Tighten studs in accordance with section 8.
Ensure correct position of the seal!
5. Perform leak and functional tests after mounting.
C
A
6. Screws (4xM5x20) for VD assembly are supplied.
A
1. Mount flange into pipe systems. Use appropriate sealing agent.
2. Insert VB together with supplied O-rings.
Check current position of O-rings.
A
3. Tighten supplied screws (8xM8x30) in accordance with section 8.
4. Screws (4xM5x25) for VD assembly are supplied.
5. After installation, perform leakage and functional test.
6. Disassembly in reverse order.
A
Mounting position MBE / VB / VD
VD-V
VDR
VB
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hrx92r-fgrHrx92-fgrHrx512-fgrHrx515-fgrHrx520-fgr

Table of Contents