PART II: INSTALLATION
Gas train with valves group VGD and MBE with built-in gas pressure governor + gas leakage pressure
switch (PGCP)
PSH
M
VGD
Legend
1 Filter
2 Pressure switch - PGMIN
3 Safety valve with built in gas governor
4 Proving system pressure switch - PGCP
5 Pressure switch PGMAX: mandatory for MBE, optional for VGD and MB-DLE
MultiBloc MBE
ALLA V. FARFALLA
Example of gas train MBE
GAS BRUCIATORE ø185
PS
PS pressure sensor
ATTENTION: once the gas train is mounted according, the gas proving test mus be performed, according to the
procedure set by the laws in force.
ATTENTION: it is recommended to mount filter and gas valves to avoid that extraneous material drops inside the
valves, during maintenance and cleaning operation of the filters (both the filters outside the valves group and the
ones built-in the gas valves).
WARNING: Slowly open the fuel cock to avoid breaking the pressure regulator.
BY OTHERS
SUPPLIED BY BURNER CONSTRUCTOR
PS
PSL
GAS INLET
1
9
10
M
VD-R
S
VD-V
Gas filter
18
PSH
PS
PSL
7
PT
MBE
1
9
10
6 Butterfly valve
7 Pressure transducer
8 Main burner
9 Antivibration joint (*optional)
10 Manual valve(*optional)
VD-V
EV2
EV2
PGMAX
PGMAX
PGCP
GAS INLET
501939
VD-R
EV1
EV1
PGMI
PGMIN
PGCP