Version With Control Compulsory Locking; Switching On The Positive Locking - deconta C 400 V Operating Instructions Manual

Water management system
Table of Contents

Advertisement

8.3

Version with control compulsory locking

Hose connections, as described under 8.1 Make hose connections as described
under 8.1
Switch off main switch
Set the circuit breaker for the instantaneous water heater inside the appliance to "0".
Disconnector
Instantaneous
water heater
Switch on main switch
Press the "Shower water start" button and keep it pressed (button lights up) until water
flows out of the shower.
Switch off main switch
Set the circuit breaker for the instantaneous water heater inside the appliance to "1".
Switch on main switch
8.3.1

Switching on the positive locking

Connect electric cables to the Water management system and to the shower roof of
the personnel lock.
Make sure that both doors to the shower room of the personnel lock are closed.
Set the key switch to the "Test" position, the green buttons of the door boxes in the
personnel interlock light up. After approx. 5 seconds, switch to the "Automatic"
position, the positive locking is now activated, the green buttons on the door boxes
remain lit.
Water management system C 400 V
Original operating instructions
Put into operation
Main switch
Shower water
Start
Electrical cable
connection
to the shower roof
Key switch
25 from 40
Version 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

557558562

Table of Contents