Assembly; Put Into Operation - deconta C 400 V Operating Instructions Manual

Water management system
Table of Contents

Advertisement

7

Assembly

This section contains information on the safe assembly of the machine.
The Water management system is delivered ready for operation ex works and is intended
for immediate commissioning.
If there is visible damage, do not operate the unit. Contact deconta GmbH immediately.
8

Put into operation

This section contains information on commissioning the machine.
For versions without control unit, it is essential to observe the positive locking:
To prevent damage to the heating coil in the instantaneous water heater, it is essential to
observe the following points during initial commissioning / initial filling:
Make hose connections as described on the following page
Switch off main switch
Start water supply and wait until water comes out in the shower
Switch on main switch
the unit is now ready for operation
Before initial commissioning or after a longer standstill, check whether the shaft of the
pumps can be turned by hand. To do this, insert a screwdriver into the notch at the end of
the shaft and move the shaft. The high initial resistance to rotation of the impeller in new
pumps will loosen after running-in.
Water management system C 400 V
Original operating instructions
Assembly
21 from 40
Version 2