Version With One Wastewater Pump / With Forced Locking - deconta C 400 V Operating Instructions Manual

Water management system
Table of Contents

Advertisement

8.1

Version with one wastewater pump / with forced locking

Main switch
Wastewater OUT
Water inlet
Make hose connections:
o Connecting the "water inlet" connection to the mains supply
o Connecting "hot shower water" to the shower roof
o Connect "wastewater IN" connection to shower floor
o Connect the "wastewater OUT" connection to the sewage system
Fill wastewater pump with water
Fill the filter housing of the 220µ filter with water.
Hand-tighten the union nuts of the filter housings
Establish power connection
Water management system C 400 V
Original operating instructions
Shower water
Put into operation
Wastewater IN
22 from 40
Version 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

557558562

Table of Contents