6 - INSTALLATION

6.3 - Assembling the blocks

Ensure sufficient servicing space to allow easy maintenance and assembly of the blocks.
The air inlets must be capped if installation is interrupted. A waterproof film is recommended to prevent white rust.
Electrical safety
The components and cables must be selected in accordance with the regulations in force at the installation site.
Always comply with the overvoltage, pollution and insulation voltage categories set by the standards and regulations.
Take into account the altitude when selecting the components and cables
Reminder: For units delivered unregulated and installed in CE zones, CE certification for the complete assembled unit is the
responsibility of the person assembling it.
Make sure the ground is flat for the purposes of installing the unit and connecting the blocks.
To ensure a tight seal between joined sections, they must be shimmed and levelled to compensate for any unevenness of the
mounting surface.
Air flow
direction
The unit must be grounded via its frame. Make sure all electric components are grounded.
■ The units are supplied with transport feet B .
They must be removed and possibly replaced with adjustable feet or risers before final assembly. (see § 6.4).
■ Affix the cleats (2) supplied in the connection kit (fig.A) in the dedicated holes using long screws 4.8 x 40 mm (5) in each block.
Fig. A
B
E
F
C
D
Levels
B
C
F