Maintenance - M&C TEC1 Series Operation Manual

Thermoelectric chiller
Table of Contents

Advertisement

Maintenance

It is necessary to schedule maintenance work at least twice a year.
The intervals between servicing are dependent on the process and system conditions in your facility.
The facility QA/QC plan should address the frequency for maintenance and should be updated based
on your operations.
Danger
Warning
The four hexagon socket screws, see Figure
ft/lb) by using a torque wrench. Start to re-tighten one screw. Tighten the opposite screw to the same
amount, then select the adjacent pair. Repeat in the same sequence to reach the value of 5 Nm (3.69
ft/lb).
The bellows and valve plates are the only consumable parts of the pump. The valve plates need to be
Please refer to the spare parts list in chapter 17 for our recommended spare parts.
www.mc-techgroup.com
Follow all safety notes and descriptions stated in this manual.
There may be harmful sample gases in the pump. Prevent potentially
harmful gases from escaping the open sample gas lines during mainte-
nance. Purge the pump with inert gas or air before servicing.
High voltage!
Working without disconnecting the power supply may cause an electrical
shock. Disconnect power supply before any assembly, maintenance or
disassembly.
Secure the pump against accidental restart.
Aggressive condensate possible.
Chemical burns possible due to aggressive media!
For general electrical and mechanical work on the pump, wear personal
protective equipment (PPE) in accordance with the risk assessment.
part G, need to be re-tightened to a value of 5 Nm (3.69
9
They are easy to replace.
MP-
| 1.04.01
23

Advertisement

Table of Contents
loading

Related Products for M&C TEC1 Series

Table of Contents