Benchmark 5000 Air/Fuel Valve Position And Energy Input - Watts AERCO Benchmark OMM-0136 Operation And Service Manual

Natural gas, propane gas and dual fuel modulating & condensing boilers
Table of Contents

Advertisement

Benchmark Platinum-Edge [II]: Operation-Service Manual
SECTION 3 - START SEQUENCE

3.4.7 Benchmark 5000 Air/Fuel Valve Position and Energy Input

BMK5000 Air/Fuel Valve Position and Energy Input
Air Fuel Valve
Position
(% Full Open)
10%
18% (Stop Level)
30%
40%
50%
60%
70%
80%
90%
100%
BMK5000 Gas Pressure De-Rating Chart
Gas Pressure @ SSOV
in inches W.C. (kPa)
Inlet
56"
(13.9 kPa)
14"
(3.49 kPa)
10"
(3.23 kPa)
OMM-0137_E • GF-211 •
12/13/2019
Boiler Energy Input
BTU/Hr
0
400,000
(117 kW)
997,217
(292 kW)
1,667,848 (489 kW)
1,992,380 (584 kW)
2,486,881 (729 kW)
2,981,381 (874 kW)
3,780,230 (1108 kW)
4,375,500 (1282 kW)
5,000,000 (1465 kW)
Energy Input in
Outlet
6.8"
(1.70 kPa)
5,000,000 (1465 kW)
6.8"
(1.70 kPa)
5,000,000 (1465 kW)
6.8"
(1.70 kPa)
5,000,000 (1465 kW)
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
% of Full
Capacity
0%
8%
20%
33%
40%
50%
60%
76%
88%
100%
Oxygen
BTU/hr
(%O
2
5.7
5.7
5.7
DeRating
)
(% Full Fire)
0%
0%
0%
Page 30 of 153

Advertisement

Table of Contents
loading

Table of Contents