maintenance
HZ54E-LP Unit
1) Loosen 6 screws that secure the burner extenders. on burner tray, located
behind the burner on either side of the pilot assembly.
2) Lift out the 2 burner tray extenders.
Burner Tray
Burner Tray Extenders
3) After extenders have been removed, remove the 2 screws that secure the
burner tray, at the base of the firebox.
4) Slide the burner to the left and lift it out.
Location of screws securing burner
5) With burner removed - lift out burner tray.
66
Regency Horizon ® HZ54E-11 Gas Fireplace
|
Burner Tray Extenders
Burner Bracket
6) Disconnect the green and orange wires from the valve.
7) Disconnect the green ground wire from the valve bracket.
8) Remove the valve tray by undoing 12 screws.
9) Partially lift out valve tray.
10) Disconnect the inlet gas line.
11) Replace valve and reverse steps.
Orange Wire
Green Wire
Green Ground Wire
Gas Inlet Line