JinkoSolar JKM565N-72HL4-V Installation Manual page 6

Photovoltaic module
Table of Contents

Advertisement

other metal products, so as not to cause electric shock danger and damage the modules.
Keep the PV module packed in the carton until installation. Once the modules are removed from the
packing box, they should be installed and connected to the bus box in time. If they are not installed
immediately, protective measures (such as adding rubber joint cover, etc.) should be taken on the
connection head.
Do not touch the PV module unnecessarily during installation. The glass surface and the frame may
be hot. There is a risk of burns and electric shock.
Do not work in rain, snow or windy conditions.
Due to the risk of electrical shock, do not perform any work if the terminals of the PV module are wet.
Use insulated tools and do not use wet tools.
When installing PV modules, do not drop any objects (e.g., PV modules or tools).
Make sure flammable gasses are not generated or present near the installation site.
Insert module connectors fully and correctly. An audible "click" sound should be heard. This sounds
confirms the connectors are fully seated. Check all connections.
Connect the male and female connectors correctly, check the wiring condition, all wires shall not be
separated from the modules, and secure the wires with cable ties so that the wires do not scratch or
squeeze the back sheet of the modules.
Do not touch the junction box and the end of the interconnect cables (connectors) with bare hands
during installation or under sunlight, regardless if the PV module is connected to or disconnected
from the system.
The junction box must be protected from direct sunlight and water. The connector must meet the
IP68 water-tight standard after being connected. However, it is not recommended to use the
connector under water for a long time.
Do not expose the PV module to excessive loads on the surface of the PV module or twist the frame.
Do not hit or put excessive load on the glass or back sheet, this may break the cells or cause micro
cracks.
During the installation or operation, don't use sharp tools to wipe the back sheet and glass. Scratches
can appear on the module.
Do not drill holes in the frame. It may cause corrosion of the frame.
When installing modules on roof mounted structures, please try to follow the "from top to bottom"
and/or "from left to right" principle, and don't step on the module. This will damage the module and
would be dangerous for personal safety.
Modules will have thermal expansion and cold contraction effect. When installing, the interval
between two adjacent conventional modules is recommended > 10mm.The minimum clearance
between two adjacent double-sided modules is recommended > 20mm;If there are special
requirements, please confirm with Jinko and install it;
-4-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents