JinkoSolar JKM565N-72HL4-V Installation Manual page 25

Photovoltaic module
Table of Contents

Advertisement

f) Follow the requirements of applicable local and national electrical codes.
g) These modules contain factory installed by pass diode .If these modules are incorrectly connected to
each other, the bypass diodes, cable or junction box may be damaged.
h) The cable of the junction box is defined as L, as showed below in Figure 10. For Jinko standard full
module L is 900/1200mm, the half–cut module L is 145/290mm, and the SWAN bifacial module L is
150/250mm. For customized module, L can be based on your condition. Please take the cable length
into consideration before designing the wiring layout.
Figure 10 (2): The half–cut module/SWAN bifacial module junction box
Figure 9:Ground installation of PV modules
Figure 10 (1): The full module junction box
-23-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents