Lower Frame Tube Installation; Upper Frame Assembly Installation - Peco 28120903 Operator's Manual

Pto driven-grass collection system
Table of Contents

Advertisement

Lower Mount Tube Installation
Attach both Lower Mount Tubes P#(B0939) by using (2) 5/16"-18 x 2.5" U-Bolts P#(K1098) and (4) 5/16"-18 Ny-
Flange Locknuts P#(K2516) PER Lower Mount Tube. Refer to Figure A.
Note: Some parts and part features have been hidden from view for visual clarity.
Figure A
(2) U-Bolts &
(4) Ny-Flange Locknuts

Upper Frame Assembly Installation

Position the Upper Frame Assembly P#(A2047) above the Lower Mount Tubes as shown in Figure B. Slide the Upper
Frame Assembly down onto the Lower Mount Tubes and secure using (2) Clevis Pins P#(K0133) and (2) Hair Pin
Clips P#(K0088).
Figure B
Upper Frame
Assembly P#(A2047)
Lower Mount
Tube P#(B0939*)
using (2) Clevis Pins
Secure
and (2) Hair Pin Clips
Lower Mount Tubes

Advertisement

Table of Contents
loading

Table of Contents