1MRK 505 395-UEN Rev. G
9.9

Control

9.9.1

Synchrocheck, energizing check, and synchronizing SESRSYN

This section contains instructions on how to test the synchrocheck, energizing check, and
synchronizing function SESRSYN for single arrangements.
Prepare the IED for verification of settings as outlined in section
section
At commissioning and periodical checks, the functions shall be tested with the used settings. To test
a specific function, it might be necessary to change some setting parameters, for example:
AutoEnerg = Off/DLLB/DBLL/Both
ManEnerg = Off
Operation = Off/On
Activation of the voltage selection function if applicable
The tests explained in the test procedures below describe the settings, which can be used as
references during testing before the final settings are specified. After testing, restore the equipment
to the normal or desired settings.
A secondary injection test set with the possibility to alter the phase angle and amplitude of the
voltage is needed. The test set must also be able to generate different frequencies on different
outputs.
Figure
21
description describes the test of the version intended for one bay.
Test
equipment
IEC05000480 V4 EN-US
Figure 21:
Line differential protection RED650
Commissioning manual
"Preparing for test"
in this chapter.
The description below applies for a system with a nominal frequency of 50 Hz but
can be directly applicable to 60 Hz. SESRSYN can be set to use different phases,
phase to earth or phase to phase. Use the set voltages instead of what is indicated
below.
shows the general test connection principle, which can be used during testing. This
U-Bus
U-Line
N
General test connection with three-phase voltage connected to the line side
© 2017 - 2022 Hitachi Energy. All rights reserved
IED
UMeasure
U3PBB1
Ph/N
Ph/Ph
N
Input Phase
L1,L2,L3
L12,L23,L31
UMeasure
Ph/N
U3PLN1
Ph/Ph
UL1
UL2
Input Phase
UL3
L1,L2,L3
N
L12,L23,L31
IEC05000480-4-en.vsd
Testing functionality by secondary injection
"Requirements"
and
Section 9
SEMOD53560-1 v2
M2377-3 v12