ABB Relion 650 Series Commissioning Manual page 8

Line differential protection
Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

Table of contents
Section 5
Configuring the IED and changing settings..............................................39
5.1
Overview............................................................................................................................. 39
5.2
Configuring analog CT inputs..............................................................................................39
5.3
Supervision of input/output modules................................................................................... 40
Section 6
6.1
Entering settings..................................................................................................................41
6.1.1
Entering SPA settings........................................................................................................41
6.1.2
Entering IEC settings.........................................................................................................41
6.2
Verifying the communication............................................................................................... 41
6.2.1
Verifying SPA communication........................................................................................... 42
6.2.2
Verifying IEC communication............................................................................................ 42
6.3
Fiber optic loop....................................................................................................................42
6.4
Section 7
7.1
Communication via the rear ports ...................................................................................... 45
7.1.1
LON communication..........................................................................................................45
7.1.2
The LON Protocol..............................................................................................................46
7.1.3
Hardware and software modules.......................................................................................46
7.2
Optical budget calculation for serial communication with LON .......................................... 47
Section 8
Testing IED operation..................................................................................49
8.1
Preparing for test.................................................................................................................49
8.1.1
Requirements....................................................................................................................49
8.1.2
Preparing the IED to verify settings...................................................................................50
8.2
Activating the test mode...................................................................................................... 51
8.3
Preparing the connection to the test equipment..................................................................51
8.4
Connecting the test equipment to the IED...........................................................................52
8.5
Releasing the function to be tested..................................................................................... 52
8.6
Verifying analog primary and secondary measurement...................................................... 53
8.7
Testing the protection functionality...................................................................................... 53
8.8
Forcing of binary input/output signals for testing.................................................................54
8.8.1
Forcing concept.................................................................................................................54
8.8.2
How to enable forcing........................................................................................................54
8.8.2.1
8.8.2.2
8.8.3
How to change binary input/output signals using forcing.................................................. 55
8.8.3.1
8.8.3.2
8.8.4
8.8.4.1
8.8.4.2
8.8.4.3
Section 9
Testing functionality by secondary injection............................................59
9.1
Testing disturbance report................................................................................................... 59
2
Enable forcing by using LHMI...................................................................................... 54
Enable forcing using TESTMODE function block.........................................................54
Forcing by using LHMI................................................................................................. 55
Forcing by using PCM600............................................................................................56
Undo forcing by using TESTMODE component...........................................................58
Undo forcing by using LHMI.........................................................................................58
Undo forcing by using PCM600................................................................................... 58
© 2017 - 2022 Hitachi Energy. All rights reserved
1MRK 505 395-UEN Rev. G
Line differential protection RED650
Commissioning manual