ABB Relion 650 Series Commissioning Manual page 112

Line differential protection
Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

Section 9
Testing functionality by secondary injection
IEC07000106 V2 EN-US
Figure 18:
where:
1
2
3.
Decrease slowly the voltage in phase UL1 of the test set until the START signal resets.
4.
Check U1 blocking level by comparing the voltage level at reset with the set undervoltage
blocking U1Low.
5.
Repeat steps
Check of U2Low
Procedure
1.
Connect voltages to the IED according to valid connection diagram and figure 19.
106
UL1
UL2
UL3
UN
Connection of the test set to the IED for test of U1 block level
is three-phase voltage group1 (U1)
is three-phase voltage group2 (U2)
2
to
4
to check U1Low for the other phases.
The connections to U1 must be shifted to test another phase. (UL1 to UL2, UL2 to
UL3, UL3 to UL1)
© 2017 - 2022 Hitachi Energy. All rights reserved
UL1
UL2
1
UL3
UN
UL1
2
UL2
UL3
IEC07000106-1-en.vsd
Line differential protection RED650
1MRK 505 395-UEN Rev. G
SEMOD175258-91 v3
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion red650