Completing The Test; Current Reversal And Weak-End Infeed Logic For Distance Protection 3-Phase Zcrwpsch; Function Revision History; Current Reversal Logic - ABB Relion 650 Series Commissioning Manual

Line differential protection
Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

1MRK 505 395-UEN Rev. G
1.
Activate the guard input signal (CRG) of the IED.
2.
Using the scheme selected, check that a signal accelerated trip (TRIP) is obtained when the
guard signal is deactivated.
9.10.1.7

Completing the test

Continue to test another function or end the test by changing the TESTMODE setting to Off. Restore
connections and settings to the original values, if changed for testing purposes.
9.10.2
Current reversal and Weak-end infeed logic for distance
protection 3-phase ZCRWPSCH
Prepare the IED for verification of settings as outlined in section
section
Values of the logical signals for ZCRWPSCH are available on the local HMI under Main menu/Tests/
Function status / Scheme communication / ZCRWPSCH(85) /ZCRWPSCH:1.
The Signal Monitoring in PCM600 shows signals that are available on the Local HMI.
The current reversal logic and the weak-end infeed functions are tested during the secondary-
injection test of the impedance or overcurrent protection zones together with the scheme
communication logic for the distance protection function ZCPSCH.
9.10.2.1

Function revision history

Document
revision
B
C
D
E
F
G
H
J
K
L
M
9.10.2.2

Current reversal logic

It is possible to check the delay of the CS send signal with tDelayRev by changing from a reverse to
a forward fault.
By continuously activating the CR input and changing from a reverse to a forward fault, the delay
tDelayRev can be checked.
Line differential protection RED650
Commissioning manual
"Preparing for test"
in this chapter.
Product
History
revision
2.2.1
-
2.2.2
-
2.2.2
2.2.2
-
2.2.3
-
2.2.3
-
2.2.3
-
2.2.4
-
2.2.4
-
2.2.4
2.2.5
Added DOs for teleprotection permissive (TxPrm & RxPrm1) transmit and receive signals
in accordance with 61850 Ed 2.0
© 2017 - 2022 Hitachi Energy. All rights reserved
Testing functionality by secondary injection
"Requirements"
and
GUID-23BE6A6F-8D87-4CD9-952B-40EE65D7F04C v1
Section 9
M13868-84 v6
M14947-2 v7
M14947-8 v3
131