8.4
Final checks
Obscure the photocell and switch on the control devices:
the burner should start and then lockout about 5 s after
st
opening of the 1
nozzle operation valve.
Illuminate the photocell and switch on the control devices:
the burner should start and then go into lockout after about
10 s.
Obscure the photocell while the burner is operating, the fol-
lowing must occur in sequence:
flame extinguished within 1s, pre-purging for about 20s,
sparking for about 5s, burner goes into lock-out.
Switch off control device TL while the burner is operating:
the burner should stop.
Start-up, calibration and operation of the burner
25
GB
6426