Daikin ERGA06EAV3H Installer's Reference Manual page 218

Hide thumbs Also See for ERGA06EAV3H:
Table of Contents

Advertisement

11
|
Configuration
Power consumption control
Installer reference guide
218
#
Code
[9.8.8]
N/A
Power consumption control
See
"6  Application
guidelines"  [
functionality.
#
[9.9.1]
[4-08]
[9.9.2]
[4-09]
Limit when [9.9.1]=Continuous and [9.9.2]=Amp:
#
[9.9.3]
[5-05]
Limits when [9.9.1]=Inputs and [9.9.2]=Amp:
Limit setting kW
Restriction: Only applicable if:
[9.8.4]=Smart grid.
There is no pulse meter (power meter) for
photovoltaic
Electricity meter 2=None)
Normally, when a pulse meter is available, the
following happens:
The pulse meter measures the power
produced by the photovoltaic panels.
The unit limits its power consumption during
the Smart Grid's "Recommended ON" mode to
only use the power provided by the
photovoltaic panels.
However, when the pulse meter is not available,
you can still limit the unit's power consumption
using this setting (Limit setting kW). This
prevents overconsumption and thus requiring
the use of power from the grid.
4
  33] for detailed information about this
Code
Power consumption control:
0 No: Disabled.
1 Continuous: Enabled: You can set one
power limitation value (in A or kW) to which
the system power consumption will be
limited for all the time.
2 Inputs: Enabled: You can set up to four
different power limitation values (in A or kW)
to which the system power consumption will
be limited when the corresponding digital
input asks.
Type:
0 Amp: The limitation values are set in A.
1 kW: The limitation values are set in kW.
Code
Limit: Only applicable in case of full time
current limitation mode.
0 A~50 A
Description
panels
available
Description
Description
ERGA04~08EAV3+V3A+V37 + EHSH/X(B)04+08P30+50EF
Daikin Altherma 3 R ECH₂O
4P678716-1 – 2022.01
([9.A.2]

Advertisement

Table of Contents
loading

Table of Contents