Daikin Vision Installation And Maintenance Manual page 13

Table of Contents

Advertisement

STEP 2: Insert the HEPA filter into the HEPA Holding Frame.
The HEPA should be installed with the gasket side of the
filter facing the frame. Insert the filter as far into the frame as
possible, so that the gasket material is contacting the frame.
See
Figure
20.
The filter should now be resting inside of the holding frame.
When installing the filters into a frame bank of multiple frames,
install the lower filters first so that the upper filters can rest on
the lower filters
(Figure
21).
Figure 19: Frame with Leg Extensions Installed
Figure 20: Insert HEPA Filter into Frame, until the Gasket
Comes in Contact with the Holding Frame
www.DaikinApplied.com
STEP 3: Place a latch so that it overlaps the leg extension,
as shown in
Figure
22. Align the latches' cap screw with
the threaded coupling on the end of the leg extension and
tighten using the hexkey. Tighten the cap screw until there
is an approximately 1/4" gap between the latch and the leg
extension coupling as shown in
with all 4 corners.
Figure 21: Filter Placed Inside of Frame
Figure 22: Latch Overlapping Leg Extension
Figure 23: Tighten Cap Screw to 1/4" of the Coupling
13
Installation Guidelines
Figure
23. Repeat this step
IM 915-13 • VISION - EXTENDED SIZES

Advertisement

Table of Contents
loading

Table of Contents