6.3.2 Precautions when mounting the outdoor unit
6.3.3 To provide the installation structure
RXQ-A_ARXQ-A
R32 split series
4P513661-11P – 2021.11
Typical workflow
Mounting the outdoor unit typically consists of the following stages:
1
Providing the installation structure.
2
Installing the outdoor unit.
3
Providing drainage.
4
Preventing the unit from falling over.
5
Protecting the unit against snow and wind by installing a snow cover and baffle
plates. See
"6.1 Preparing the installation
INFORMATION
Also read the precautions and requirements in the following chapters:
▪
"2 General safety
▪
"6.1 Preparing the installation
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Use a vibration-proof rubber (field supply) in cases where vibrations may be
transmitted to the building.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
Prepare 4 sets of M8 or M10 anchor bolts, nuts and washers (field supply).
(mm)
a 100 mm above expected level of snow
4
site" [
4
precautions" [
7]
site" [
4
24]
6
Unit installation
|
24].
Installer reference guide
29