Download Print this page

Keysight Technologies N5241BU-677 Installation Manual page 49

Advertisement

Description of the Upgrade
Installation Procedure for the Upgrade
Calibration
Although the analyzer functions, its performance relative to its specifications
has not been verified. It is recommended that a full instrument calibration be
performed using the analyzer's internal performance test software. To view
information on the performance test software, click the Chapter 3 bookmark
"Tests and Adjustments" in the PDF Service Guide
1
.
Step 32. Prepare the PNA–X for the User
1. If necessary, reinstall front jumper cables.
2. Install the cable guards, pushing them over the front jumper cables until
the cushioning material touches the front panel of the PNA.
3. Install the dust caps on the test ports.
4. Clean the analyzer, as needed, using a damp cloth.
Installation Note N5242-90127
49

Advertisement

loading

This manual is also suitable for:

N5242bu-677N5249bu-677N5242-60127