Put The Incubator Into Operation - VWR International 1915A Installation And Operation Manual

Table of Contents

Advertisement

OPERATION
P
I
UT THE
NCUBATOR INTO
Perform the following steps and procedures to put the unit into operation after installing it in a new
workspace environment.
1.
Plug in the power cord
2.
Turn on the incubator
3.
Set the Temperature Set Point
4.
Allow the incubator to heat soak for a minimum of 8 hours
5.
Set the Over Temperature Limit
The incubator is now ready for use.
You may
Load
Samples, see page 29.
26 |
P a g e
O
PERATION
Attach the power cord that came with the unit to the inlet
receptacle on the left side of the incubator.
Plug the power cord into the workspace electrical outlet.
Place the incubator Power Switch in the ON ( I ) position.
See the
Set the Temperature Set Point
page 27.
Run the unit for at least 8 hours (for example, overnight) with
chamber door closed prior to:
Setting the Over Temperature Limit (next step).
Loading samples.
Set the Over Temperature Limit.
The incubator must be heated and stable at your
application temperature prior to performing this procedure.
procedure on
See page 28.

Advertisement

Table of Contents
loading

This manual is also suitable for:

1925a

Table of Contents