INSTALLATION

I
P
NSTALLATION
ROCEDURE
For installing the unit in a new workspace location.
Pre-Installation
Check that the required ambient conditions for the unit are met, page 16.
Check that the spacing clearance requirements are met, page 16.
Unit dimensions may be found on page 39.
Check that a suitable electrical outlet and power supply is present, page 17.
Install the incubator in a suitable workspace location
Review the lifting and handling instructions, page 18.
Install the unit leveling feet, page 18.
Install the unit in its workspace location, page 18.
Set up the incubator for use
Clean and disinfect the unit and shelving (recommended), page 19.
Install the shelving, page 20.
Verify the port cap has been installed in the access port, page 20.