Connecting Power And Turning On - ADIC AIT 100D Installation And Operating Manual

Quantum ait 100d: user guide
Table of Contents

Advertisement

Connecting Power and Turning On

p
Plug the power cord into the back of the AIT-70D/100D.
p
Plug the power cord from the AIT-70D/100D into a GROUNDED electrical outlet.
p
Plug the power cord from your host system into the same GROUNDED electrical circuit if possible.
Computers and peripherals should always share the same grounds.
p
Turn on the power to your host system.
p
Turn the AIT-70D/100D power on.
4
If your external SCSI bus terminator has a Term Power LED it should also be illuminated.
4
The AIT-70D/100D LCD will light up.
p
All three front panel LEDs will illuminate together for 0.25 seconds, then go off together for 0.25
seconds. This will repeat once.
p
The Busy LED will illuminate for 0.25 seconds, then go off.
p
The Tape LED will illuminate for 0.25 seconds, then go off.
p
The Status LED will illuminate for 0.25 seconds, then go off.
p
The last three steps above will repeat until the power-on diagnostics completes.
14
Operation
Turning on the host computer first ensures that the SCSI bus
terminators stabilize the bus signals before the AIT-70
is turned on.
Note
/100
D
D

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ait 70d

Table of Contents