5
Piping installation
⚠
NOTE! To prevent leaks ensure that there are no stresses in
the connecting pipes!
⚠
NOTE! It is important that the heating system is completely
bled after installation.
⚠
NOTE! Bleed valves must be installed where necessary.
5.1
Connection diagram
Pipe connections in image:
2
Water heater, return pipe
4
Heating system supply pipe
5
Heating system return pipe
8
Heating system, return pipe
9
Bleed valve, at stainless steel water heater
11 Tap hot water
12 Cold water
13 Water heater, supply pipe to TWS coil
6
4
5
10
7
1
Figure 20: General connection diagram.
12
Strainer
6
3
Figure 19: Principle solution for a pipe installation.
2
3
11
12
13
14
8
9
18
17
7
• Ensure that the piping installation follows the dimension and
connection diagrams in section "Heat pump information".
• Piping installation must be carried out in accordance with appli-
cable local rules and regulations. The hot water tank must be
equipped with an approved safety valve (supplied).
Safety valve (not included)
Mixer valve
Filler cock
5
4
Heat pump
2
1
Position Name
15
1
Heat pump
2
Supply pipe
16
3
Return pipe
4
Safety valve (not included)
5
Expansion tank (not included)
6
Strainer
7
Flexible hoses
8
Bleed valve
9
Mixer valve
10
Exchange valve
11
Safety valve (9 bar)
12
Vacuum valve
13
Non-return valve
14
Shut-off valve
15
Cold water
16
Hot water
17
Water heater
18
Bleed valve at stainless steel water heater
VMBME102
Safety valve 9 bar
14
10
13
11 12
9
Water heater
8
7
Bleed valve
Bleed valve at stainless
steel water heater