Handover To Customer - Danfoss DHP-AL Installation And Service Instructions Manual

Table of Contents

Advertisement

10

Handover to customer

After installation and test operation, the customer must be
informed about their new heat pump installation. Below is a check-
list regarding the information that you must give the customer:
• The model of the heat pump that has been installed
• Run through the Maintenance instructions and show what it con-
tains
• Describe the various operating modes and what they mean
• Describe the most common alarms and corrective actions
• Demonstrate how to navigate the control computer and which
settings the customer can set themselves
• Demonstrate how to view history and operating times
• Show the pipe installation and go through the periodic mainte-
nance actions that the customers must be aware of:
- recommended pressure on manometers
- fill the heating system
- exercise safety valves
- clean strainers
• Explain how the customer can fine adjust their existing heating
system according to the instructions in the maintenance instruc-
tions
• The applicable warranties
• Where the customer is to turn for servicing
22
VMBME102

Advertisement

Table of Contents
loading

Table of Contents