Parcan 64 Long, Terminalset
Installation
Remove all packing materials from the Parcan 64 Long, Terminalset. Check if all foam and plastic
padding is removed. Connect all cables.
Do not supply power before the whole system is set up and connected properly.
Always disconnect from electric mains power supply before cleaning or servicing.
Damages caused by non-observance are not subject to warranty.
Set Up and Operation
Follow the directions below, as they pertain to your preferred operation mode.
Before plugging the unit in, always make sure that the power supply matches the product specification
voltage. Do not attempt to operate a 120V specification product on 230V power, or vice versa.
Connect the device to the main power supply.
Installing the lamp
01) Pull the mounting screw and remove the rear cover.
02) Install the Par 64 GX16d VNSP GE lamp (80107).
03) Replace the rear cover.
Fig. 02
Ordercode: 30418
8
Need help?
Do you have a question about the Parcan 64 Long Terminalset V1 and is the answer not in the manual?