Carrier EverFRESH Operation, Service And Parts Manual page 63

Table of Contents

Advertisement

3. Use retaining clips to align the polysheet curtain line on the curtain into the track across the top of the con-
tainer. Using the line will keep the curtain square.
4. Unroll the curtain ribbon and mark the mid-point.
5. At the midpoint of the ribbon, insert the curtain ribbon into the ribbon channel at the "CENTER" arrow on the
curtain.
6. Press the ribbon into the back of the curtain track and seat the front of the ribbon into the track by pushing
on the outer edge of the track.
Use care when removing the retaining clips to avoid damaging (tearing) the curtain.
7. Insert the curtain into the side channels and across the bottom rail using the retaining clips as required.
Make sure the curtain is stretched tight across the opening. Eliminate any folds or wrinkles that can lead to
air leakage.
NOTE
The flat side of the ribbon is pressed into the track.
NOTE
6–5
T-374

Advertisement

Table of Contents
loading

Table of Contents