Piping Installation; Preparing Refrigerant Piping; Refrigerant Piping Requirements; Connecting Refrigerant Piping - Daikin EKHWET-BV3 Installer's Reference Manual

Domestic hot water tank
Hide thumbs Also See for EKHWET-BV3:
Table of Contents

Advertisement

8 Piping installation

In this chapter

8.1 Preparing refrigerant piping

8.1.1 Refrigerant piping requirements

8.2 Connecting refrigerant piping

8.2.1 To connect the refrigerant piping to the indoor unit

EKHWET90+120B
R32 Split series - Domestic hot water tank
4P680077-1A - 2022.11
8.1
Preparing refrigerant piping ...................................................................................................................................................
8.1.1
Refrigerant piping requirements ...........................................................................................................................
8.2
Connecting refrigerant piping ................................................................................................................................................
8.2.1
To connect the refrigerant piping to the indoor unit............................................................................................
8.3
Preparing water piping ...........................................................................................................................................................
8.3.1
Water circuit requirements ...................................................................................................................................
8.4
Connecting water piping ........................................................................................................................................................
8.4.1
About connecting the water piping .......................................................................................................................
8.4.2
Precautions when connecting the water piping....................................................................................................
8.4.3
To connect the water piping..................................................................................................................................
8.4.4
To connect the recirculation piping.......................................................................................................................
8.4.5
To fill the domestic hot water tank........................................................................................................................
INFORMATION
Also read the precautions and requirements in the
4
precautions" [
Piping connections: Only flare and brazed connections are allowed. The indoor
and outdoor units have flare connections. Connect both ends without brazing. If
brazing should be needed, take the guidelines in the outdoor unit installer
reference guide into account.
Also see
"7.1.2  Special requirements for R32
requirements.
For information related with piping length, diameter, connections and insulation
see the Installation manual - Outdoor unit.
See the installation manual of the outdoor unit for all guidelines, specifications and
installation instructions.
NOTICE
Make sure the tank stop valves are completely open.
INFORMATION
The stop valves are factory open and the refrigerant circuit of the tank is NOT
charged.
1 Connect the liquid stop valve from the outdoor unit to the refrigerant liquid
stop valve of the indoor unit.
 9].
8
Piping installation
|
"2  General safety
4
units"  [
  29] for additional
Installer reference guide
39
39
39
39
40
40
42
42
42
42
43
43
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ekhwet120b v3 seriesEkhwet90b v3 series

Table of Contents