H&S 6128 Operator's Manual page 23

Twin-flex merger
Table of Contents

Advertisement

PTO
• The PTO is a direct drive system to the pump.
• Configure the proper PTO length and spline needed for
the tractor. Using the two set screws supplied with PTO,
connect the PTO shaft to the pump input shaft. The top
PTO shield swings back with removal of driver side pin
for easy access to PTO set screws. Replace the PTO
shield before using the machine.
• Slide the spring loaded locking collar on the PTO yoke
rearward and slide the yoke onto the tractor PTO shaft.
Release spring loaded collar. Be sure the pins fall into the
grove on the tractor PTO shaft and collar snaps forward
into position. CAUTION: Do not use a steel hammer to
aid in joining PTO parts.
Recommended PTO operating speed is 700-750 RPM
Hydraulics
• Connect the two sets of remote hoses supplied with merger to tractor remote ports.
• Each set of hoses/remotes folds/unfolds the merger heads and open/closes the deflectors.
NOTE: AFTER the heads have contacted the ground and the deflectors are open, continue
to hold the SCV/Remote control for an additional 3 to 5 seconds. This ensures the head
suspension system will work properly following the ground.
MACHINE PREP & OPERATION
-21-

Advertisement

Table of Contents
loading

Table of Contents