Connections For Each Head
1. Prepare a cable bundle comprised of the five cables in Table A. For instructions, refer to steps
1 through 5 of the Installation Guide from the Millimeter-wave Cable Dress kit (document part
number N5260-90070 contained in kit part number N5261-60019). DO NOT APPLY THE
VELCRO FASTENERS AROUND THE CABLES AT THIS TIME.
2. Connect the five cables to the front panel of the controller, using two upright angle adaptors
(1260-2604). Details are illustrated in
Recommended order of connection:
• DC POWER
• TEST IF
• REF IF
• RF OUT
• LO OUT
3. Torque all cable connections.
Figure 3-4 Details for Controller Front Panel Connections
4. Select a test head module to connect to the port. The test head module depends on the port number.
Refer to
Figure 2-5 on page
Installation and Service Guide N5251-90001
PNA, Controller, and Test Head Module Interconnections
Figure
3-4.
2-7.
System Installation
3-13

Advertisement

Table of Contents
loading

This manual is also suitable for:

N5227aN5261aN5262a

Table of Contents