Preparing For Operation - Waterous Eclipse Installation, Operation And Maintenance Manual

Compressed air system
Table of Contents

Advertisement

Safety
Introduction

Preparing for Operation

1
Product Overview
Installation
2
Operation
|
60
90
Maintenance
Troubleshooting
Use the illustrations and instructions to prepare the
system for operation. This procedure distributes the
oil in the compressor to the hoses, oil cooler, and
other system components.
Before you begin the procedure:
• Make sure that tools have been removed from the
apparatus and the equipment is clear of debris.
• Make sure that all hardware and connections are
properly tightened.
• Make sure that the drain valves are closed.
• Make sure to flow water through the oil cooler.
• Make sure that all associated equipment is
operating properly.
1 Remove the air filter, then pour 8 to 16 oz (267
to 474 ml) of ISO 68 low-foaming or anti-foam
hydraulic oil into the air inlet. Install the air filter.
2 Make sure that the compressor oil level reaches
halfway up the sight window. Refer to:
"Checking the Compressor Oil Level" on
page 74.

Advertisement

Table of Contents
loading

Table of Contents