Mitsubishi Electric MELSEC-Q QnPHCPU Programming Manual page 132

Table of Contents

Advertisement

9 CONTROL OPERATION INSTRUCTIONS
(5) Deviation check
A deviation check is made under the following condition and the result of the check is output to
DVLA of the alarm detection (ALM) and the deviation large alarm (BB1) of the block memory.
DVL
(DVL
|DV|
*1: When DVLI or ERRI in the alarm detection inhibition (INH) is set to 1, DVLA and BB1 show
0 since the alarm is prohibited.
(6) Loop stop processing
(a) Setting 1 in SPA of the alarm detection (ALM) selects a loop stop.
A loop stop performs the following processing and terminates the S.BPI instruction.
1) BW is turned to 0.
2) DVLA of the alarm detection (ALM) is turned to 0.
3) The operation mode (MODE) is changed to MAN.
4) BB1 of BB are turned to 0.
(b) Setting 0 in SPA of the alarm detection (ALM) selects a loop run.
A loop run performs "(7) Control cycle judgment".
(7) Control cycle judgment
(a) If the specified control cycle is not reached, BW is turned to 0 and the S.BPI instruction is
terminated.
(b) When the specified control cycle is reached, "(1) SV setting processing" is performed.
Error
• When an operation error occurs
9 - 47
Condition
|DV|
DVLS)
|DV|
DVL
(DVL
DVLS)
Result
*1
DVLA
BB1
1
DVLA
BB1
Last value status hold
DVLA
BB1
0
MELSEC-Q
*1
Error code: 4100
9 - 47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec-q qnprhcpu

Table of Contents