Download Print this page

saunalife Garden G7 Installation Manual

Advertisement

Quick Links

Garden-Series Model G7 & G7S
INSTALLATION GUIDE

Advertisement

loading

Summary of Contents for saunalife Garden G7

  • Page 1 Garden-Series Model G7 & G7S INSTALLATION GUIDE...
  • Page 2: Installation Requirements

    Thank you for purchasing a SaunaLife outdoor sauna! 1. INSTALLATION REQUIREMENTS The base or foundation for Sauna must be leveled and stable. Sauna must be at least 3 inches higher from the surrounding ground. All base beams must have a support under them.
  • Page 3 2. TRANSPORT Sauna can be lifted from above: Sauna can be lifted from below:...
  • Page 4: Final Assembly

    3. FINAL ASSEMBLY Final assembly shall be organized by the client. Final assembly includes installing of the: • Parapet metal • Decorative base boards • Outdoor lights 120V • Heater (+ control unit) • Rainwater system • Cables • Electrical cabinet for Lighting 3.1 Final Assembly Instructions 3.1.1 Parapet metals must be installed to avoid weather damage of the sauna:...
  • Page 5: Maintenance

    3.1.2 Base boards are for decorative purposes and easy to install. Rainwater system must be installed when sauna is exposed to rainwater. 4. MAINTENANCE Maintenance of the outdoor cladding should be done once a year. If sauna is used twice a week, then interior cladding, sauna bench and floor grid should be oiled once a year.
  • Page 6 Rev 4/2023...

This manual is also suitable for:

Garden g7s