SMA SB3.0-1SP-US-41 Installation Manual page 45

Hide thumbs Also See for SB3.0-1SP-US-41:
Table of Contents

Advertisement

SMA Solar Technology AG
Connect the switch for secure power supply operation
Requirements for the conductors:
☐ Conductor cross-section: 0.2 mm² to 2.5 mm² (24 AWG to 14 AWG)
☐ The conductor type and wiring method must be appropriate for the application and location.
☐ Maximum length of conductors: 10 m (393.7 in)
Procedure:
1. Remove the sealing plug from the opening for connecting the switch for secure power supply
operation.
2. Insert the conduit fitting into the opening and tighten from the inside using the counter nut.
3. Attach the conduit to the conduit fitting.
4. Guide the conductors into the inverter.
5. Strip off the conductor insulation by min. 6 mm (0.24 in) to max. 10 mm (0.39 in).
6. Connect the conductors to the 2-pole terminal
blocks. Ensure that the conductors are plugged
completely into the terminal points up to their
insulation.
7. Stick the terminal block into the SPS slot on the
communication assembly in the inverter.
8. Ensure that the terminal block is securely in place.
9. Ensure that all conductors are correctly connected.
10. Ensure that the conductors sit securely in the terminal points. Tip: To release the conductors
from the terminal block, open the terminal points using a suitable tool.
11. Install switch in desired position (e.g. next to the inverter or as switch/outlet combination
optionally at short distance from the inverter (to max. 10 m (393.7 in))).
12. Connect the other end of the cable directly to the switch.
Installation Manual
6 Electrical Connection
FCC ID: SVF-KP20
IC: 9440A-KP20
A
B
D-IN
SPS
SBxx-1SP-US-41-IA-xx-10
45

Advertisement

Table of Contents
loading

Table of Contents