Measures for preparation
Dimensional drawings
Dimensions in parentheses for DN 32 to 50
80
Fig. 5:
Dimensional drawings
4 Measures for preparation
After receiving the shipment, proceed as fol-
lows:
1. Check the scope of delivery. Compare
the shipment received with the delivery
note.
2. Check the shipment for transportation
damage. Report any damage to
SAMSON and the forwarding agent
(refer to delivery note).
4.1 Unpacking
Information
Do not remove the packaging until immedi-
ately before installation.
Î Dispose of the packaging in accordance
with the valid regulations.
22
Intermediate
insulating piece
(1992-3132)
Version
Bulb sensor
with
with screw
thermowell
gland
SW 4
50
Manual adjuster
4.2 Transporting and lifting
Due to the low service weight, lifting equip-
ment is not required to lift and transport the
regulator (e.g. to install it into the pipeline).
Transport instructions
− Protect the device against external influ-
ences (e.g. impact).
− Do not damage the corrosion protection
(paint, surface coatings). Repair any
damage immediately.
− Protect the device against moisture and
dirt.
− Observe permissible temperatures (see
section 3.1).
− See Referenced documentation on
page 8.
SW 10
SW 36
EB 3135-2 EN