Measures For Preparation; Unpacking; Transporting And Lifting - Samson 2406 Mounting And Operating Instructions

Excess pressure valve self-operated pressure regulators
Table of Contents

Advertisement

Measures for preparation

4 Measures for preparation
After receiving the shipment, proceed as fol-
lows:
1. Check the scope of delivery. Compare
the shipment received with the delivery
note.
2. Check the shipment for transportation
damage. Report any damage to
SAMSON and the forwarding agent
(refer to delivery note).

4.1 Unpacking

Do not remove the packaging until immedi-
ately before installing the valve into the pipe-
line.
Proceed as follows to lift and install the de-
vice:
1. Remove the packaging from the device.
2. Dispose of the packaging in accordance
with the valid regulations.
18

4.2 Transporting and lifting

Due to the low service weight, lifting equip-
ment is not required to lift and transport the
device (e.g. to install it into the pipeline).
NOTICE
!
Risk of valve damage due to incorrectly at-
tached lifting equipment.
Do not attach lifting equipment to mounting
parts (e.g. adjusting screw or control line).
Transport instructions
− Protect the device against external influ-
ences (e.g. impact).
− Do not damage the corrosion protection
(paint, surface coatings). Repair any
damage immediately.
− Protect the device against moisture and
dirt.
− Observe the permissible ambient tem-
peratures (see section Table 1).
EB 2522 EN

Advertisement

Table of Contents
loading

Table of Contents