Powering-On The Module - Waters Pump Control Module II Installation Manual

Table of Contents

Advertisement

Powering-on the module

When powering-on the module, power-on all peripheral devices first, and data
control system last. Follow the instructions in the corresponding installation
guide for each device for connection information or procedures.
Caution:
• To avoid damaging the module and voiding its warranty, perform
all procedures in the order specified in this guide before you
power-on the module.
• Do not switch on or off any Ethernet or IEEE-488 device while data
are being acquired.
To power-on the module
1.
Ensure that the Ethernet or IEEE-488 connections are made between
the module and the data control system (see
connections" on page 2-4
page
2-5).
2.
Ensure that the pumps are connected to the module (see
the pumps" on page
3.
Attach the power cord to the power connector on the module's rear panel
(see the figure on
outlet.
4.
Power-on the pumps and any devices connected to the external event
terminals.
Tip:
Refer to each device's installation guide for powering-on procedures.
5.
Power-on the module by pressing 1 on the power switch located on the
front panel.
6.
Power-on the data control system.
2-12
Installing the Pump Control Module II
or
"IEEE-488 signal cable connections" on
2-7).
page
2-4), and then connect the power cord to a wall
"Ethernet signal cable
"Connecting

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Pump Control Module II and is the answer not in the manual?

Questions and answers

Table of Contents