5. Servicing

5.1 Procedure and caution for commissioning

Electric work should be implemented by a contractor approved by the power company.
Install the earth leakage breaker. It is required to install the breaker to prevent electric shock or fire.
(Since the inverter is used on this unit, select a shock wave resistant type.)
(1) Checking before turning on the power supply
1. Reconfirm that wires are connected correctly.
2. Check the power terminal board and installation face with a 500 V megger to see if it is 1 MΩ, or more.
3. Charge specified condensing unit oil and specified quantity of refrigerant after evacuation. (Refer Instruction manual to, 6.1. Charge of condensing unit
oil, 6.2. Calculation of the charge quantity of condensing unit oil, 6.3. Replenishment of condensing unit oil after operation, 6.4. Refrigerant charge)
4. Confirm that the operation switch (CNS2) at the bottom of controller is turned OFF. Remove the carton and the bracket before operation.
5. Anti-vibration shipping washers are not used on the compressor. Since this product does not use anti-vibration shipping washers, it is not necessary
to remove them before operation.
6. Turn on the source power supply 6 hours or more before starting the compressor to energize the crankcase without turning on the operation switch
(CNS2).
7 segment display
Operation switch(CNS2)
Carton
© Danfoss | Climate Solutions | 2023.01 | LCA012A030
Carton
Bracket
BC408445719305en-000101 | 27