Result of a step Table title Title of figure ≤ ≥ Less than or equal to, greater than or equal to Revision history Date Version Description 23 Jan. 2023 01.00 First version EN-2 Installation and Operating Instructions - EOS Future...
Establishing an electrical connection ..........DE-35 Heating period limitation..............DE-35 5 Commissioning ....................EN-36 Filling with stones ................EN-36 Starting the heater................EN-37 Switching the heater on remotely ..........EN-37 Water splash.................... EN-38 EOS Future - Installation and Operating Instructions EN-3...
Page 4
6 Service and maintenance................EN-39 Cleaning....................EN-39 Sauna stones ................... EN-40 Replacing the tubular heating elements ........EN-41 Troubleshooting ..................EN-46 7 General terms and conditions of service ........... EN-47 8 Disposal ......................EN-50 EN-4 Installation and Operating Instructions - EOS Future...
The sauna heater may not be placed on a floor made of easily flammable material (e.g. laminate or synthetic flooring). Ceram- ic tiles are recommended as a flooring option. EOS Future - Installation and Operating Instructions EN-5...
Page 6
This control unit is fixed to a suitable location on the cabin's external wall, and the corresponding tempera- ture sensor according to the installation instructions that ac- company the control units inside the sauna cabin. EN-6 Installation and Operating Instructions - EOS Future...
Spending time in a sauna cabin can lead to serious health risks or even death for persons with health impairments. Persons with health impairments who spend time in a sauna must consult a doctor before entering a sauna cabin. EOS Future - Installation and Operating Instructions EN-7...
Page 8
Children must be supervised to ensure they do not play with with reduced mental capacity the unit. Children and persons who have not received proper instruction must not clean or service the system. EN-8 Installation and Operating Instructions - EOS Future...
For an overview of the standards that were observed during design and construction of the sauna heaters, please refer to the individual product’s technical data sheet that can be downloaded from www.eos-sauna.com. Local regulations also apply to the installation and operation of heating, sauna, and steam room systems.
Identification Identification EOS Future/Future Stone is an electrically heated sauna heater for Finnish mode available in a variety of output capacities. Requirements for operation The heater must be operated with one of the following control units: EmoStyle series EmoTec series ...
The base plate is made of different stone variations depending on the model. The following parts are included in the scope of delivery: A Future sauna heater with base plate C Connecting cable, 8 m, pre-installed B Sauna stones, 40 kg D Installation and Operating Instruc- Caliber 50–100 mm...
3 x 16 A All line cross-section specifications are the minimum cross-sections for the copper line. The sauna heater must be operated by a sauna control unit. *) Not required for Compact D18/H18 control units EN-12 Installation and Operating Instructions - EOS Future...
This heater is intended solely for the purpose of heating sauna cabins, together with a suitable control unit. EOS Future/Future Stone is suitable for commercial and private use. The heater is not suitable for outdoor use. It must be operated only inside buildings and may not be exposed to envi-...
Page 14
The first time the cabin is heated, you may notice a slight odour result- ing from the evaporation of consumables used in the manufacturing processes. Air out your cabin once it has been heated and before using the sauna. EN-14 Installation and Operating Instructions - EOS Future...
Installation Installation This chapter describes how to install Future. Prior to installing the unit, air inlets and outlets must be installed in the cabin. It may be necessary to mount additional fans in the inlets/outlets. All protective films must be removed.
64 cm 6 cm 6 cm 64 cm 6 cm A Cabin ceiling D Heater guard rail B Temperature sensor E Heater C Cabin wall F Air inlet Dimensions in the cabin EN-16 Installation and Operating Instructions - EOS Future...
If the heating process takes a long time, the underlying reason is that the sauna heater receives insufficient air. A minimum of 5 times the cabin volume of air per hour must be exchanged. EOS Future - Installation and Operating Instructions EN-17...
Page 18
Supply air from below (figure on the left) and from the side (figure on the right) Air outlet The air outlet must meet the following criteria: Position: across from the heater Height: 30–50 cm above the cabin floor EN-18 Installation and Operating Instructions - EOS Future...
For placement, see Dimensions in the cabin, EN-16. NOTICE Malfunction due to damaged temperature sensor The temperature sensor is protected by its housing. Ensure that the housing and the temperature sensor are not damaged during operation. EOS Future - Installation and Operating Instructions EN-19...
Unpacking the heater and base plate Remove the heater and base plate packaging. Leave the heater and base plate on the pallet. Remove all transport locks and protective films in the heater. EN-20 Installation and Operating Instructions - EOS Future...
Page 21
Lift the heater from the pallet and place it on the underlay in front of the base plate. The rear side of the heater must face upward. EOS Future - Installation and Operating Instructions EN-21...
230 V 1N ~), the following step is required: Changing the connecting cable (optional), EN-24 Laying the connecting cable Route the connecting cable through the base of the base plate. EN-22 Installation and Operating Instructions - EOS Future...
Page 23
Drilling template for concealed connecting cable Route the connecting cable through the base of the base plate. Route the connecting cable under the cabin floor with a suitable protec- tive cover. EOS Future - Installation and Operating Instructions EN-23...
Page 24
Feed the connecting cables through the cable screw connection out from the heater. Feed the new connecting cable through the cable screw connection on the terminal box and tighten the cable screw connection. EN-24 Installation and Operating Instructions - EOS Future...
Page 25
Feed the connecting cable through the opening in the heater base. Fix the covers of the terminal box in place and screw in and tighten the screw. Put the back panel in place and screw in and tighten the screws. EOS Future - Installation and Operating Instructions EN-25...
The openings for the cable feed opening in the heater base and in the base of the base plate must point in the same direction. Tighten the connecting cable if necessary. Loosen the screws in the lower back panel and remove it. EN-26 Installation and Operating Instructions - EOS Future...
Page 27
The heater base must be accessible. Screw the screws into the holes in the heater base and tighten them with a ring or socket spanner. Put the lower housing and lower back panel in place. EOS Future - Installation and Operating Instructions EN-27...
The sauna control unit and the heater must be connected as shown in the circuit diagrams. Please observe the installation and operating instructions for the sauna control unit. See also 2.5 Technical data, EN-12. DE-28 Installation and Operating Instructions - EOS Future...
Connection diagram 9, 10, 12* and 15* kW Connection with the Econ control unit is possible only at 9 kW. *) Only for connecting to Compact D18/H18 control units. EOS Future - Installation and Operating Instructions DE-29...
Page 30
B Temperature sensor and D Power extension unit (LSG) F Mains connection for power extension safety temperature limiter unit Connection diagram 12* and 15* kW *) Not for connecting to Compact D18/H18 control units. DE-30 Installation and Operating Instructions - EOS Future...
Page 31
B Temperature sensor and D Power extension unit (LSG) F Mains connection LSG10 safety temperature limiter Connection diagram 12* and 15* kW, double circuit *) Not for connecting to Compact D18/H18 control units. EOS Future - Installation and Operating Instructions DE-31...
Connection diagram * Cable cross-sections must correspond to the sauna heater output: 9 kW – 6 mm² A distributor for the 1-phase connection can be purchased separately: Item no. 94.2689 DE-32 Installation and Operating Instructions - EOS Future...
4.2.3 Internal wiring 9 and 10 kW heater output ) r G Internal wiring 9 and 10 kW 9 kW = 6x 1500 W 10 kW = 6x 1666 W EOS Future - Installation and Operating Instructions DE-33...
Page 34
Internal wiring 12 and 15 kW (with LSG) 12 kW = 6x 2000 W 15 kW = 6x 2500 W **) Not for connecting to Compact D18/H18 control units. DE-34 Installation and Operating Instructions - EOS Future...
24-hour period before an independent restart can take place. Units used in private saunas must be limited to an operating time of 6 hours, and an automatic restart is not permitted. EOS Future - Installation and Operating Instructions DE-35...
Start the heater only if it has been filled with stones. Ensure stones with the correct caliber are used: 50–100 mm. Place the stones loosely in the rock store. EN-36 Installation and Operating Instructions - EOS Future...
Switching the heater on remotely If you switch on the heater remotely, ensure that no objects are placed on the heater. A suitable safety system, for example EOSafe D/L, can be used to prevent this. EOS Future - Installation and Operating Instructions EN-37...
10 minutes before starting the next one. This time is needed for the sauna stones to reheat. Recommendation: During a water splash, no more than approx. 10 cL of water per m³ cabin volume should be vaporised. EN-38 Installation and Operating Instructions - EOS Future...
Remove lint and dust from openings and heat reflectors. Openings can easily become blocked with lint and dust as fresh air is drawn in. This limits the air convection ability of the heater and could lead to impermissible temperatures. EOS Future - Installation and Operating Instructions EN-39...
100 mm Rinse all stones with cold water. Place the stones loosely so that there is enough space between them for air to circulate sufficiently. Filling the rock store, EN-37 EN-40 Installation and Operating Instructions - EOS Future...
Move the heater only by the base plate. Do not lift the heater. If necessary, pull the heater away from the wall if the rear of the heater cannot be reached. EOS Future - Installation and Operating Instructions EN-41...
Page 42
Loosen the screw on the cover of the terminal box and remove the cov- Loosen the connecting cable from the connection terminals. Feed the connecting cables through the cable screw connections out from the terminal box. EN-42 Installation and Operating Instructions - EOS Future...
Page 43
Pull out the terminal box with the heating coil. To do this, first press the heating coil down slightly and then pull it out forwards. Check drip trays below the heating coil for dirt and debris and clean if necessary. EOS Future - Installation and Operating Instructions EN-43...
Page 44
Fix the heating element with the serrated washers and the fixing nuts. Plug in the flat plug. Check the wiring on all heating elements before reclosing the termi- nal box and setting up the heater. EN-44 Installation and Operating Instructions - EOS Future...
Page 45
Put on the covers of the terminal box and the rear panel of the heater. Move the heater back into its original position. Place the stones in the rock store. Switch on the fuses of the heater. EOS Future - Installation and Operating Instructions EN-45...
The position of the temperature sensor Check the position of the temperature in the cabin is not optimal. sensor and adjust as needed. See 3.1.3 Temperature sensor, EN-19. EN-46 Installation and Operating Instructions - EOS Future...
Unless otherwise agreed in writing for specific instances, these terms and conditions of service shall apply to service operations, including reviewing and remedying complaints. All our existing or future legal relationships shall be governed solely by the following terms and conditions of service.
Page 48
Only original spare parts may be used within the warranty period. Service visits made by third parties shall require a written order issued by our service department. EN-48 Installation and Operating Instructions - EOS Future...
Page 49
The manufacturer’s General Terms and Conditions of Business, in the ver- sion available at www.eos-sauna.com/agb, shall apply in addition to the foregoing terms and conditions of service. EOS Future - Installation and Operating Instructions...
Electronic waste Electronic waste must be disposed of at the designated local collection point for electronic waste. Additional disposal instructions for commercial users (DE only) You can find further disposal instructions under www.eos-sauna.com/recycling EN-50 Installation and Operating Instructions - EOS Future...
Page 52
made in Germany Stand 04/2023 Druck-Nr. 2902 5209 All rights reserved.
Need help?
Do you have a question about the Future and is the answer not in the manual?
Questions and answers