5 Connecting to power supply
Wire assignment, con-
nection cable
18
5.4
Wiring plan - version IP66/IP68, 1 bar
Fig. 11: Wire assignment, connection cable
1
Brown (+) and blue (-) to power supply or to the processing system
2
Shielding
5.5
Warm-up reaction
After connecting to voltage supply or after a voltage recurrence, the
instrument passes a certain switch on routine.
By lowering the current value when switching on, the instrument can
output briefly a fault signal.
I/mA
20,5
10
< 2,3
Fig. 12: Warm-up reaction
1
Measured value
1,5
3
1
2
1
4,5
t/s
VEGACAP 64 • Two-wire