Mitsubishi GOT MELSEC A985GOT-TBA-EU User Manual page 45

Table of Contents

Advertisement

4) CC-Link connection (CC-Link dedicated cable)
• Strip the outer insulation layer at both ends of the cable by the length
shown below to expose the braided shield for grounding. (For
grounding with cable clamps. (refer to Section 5.6.3.))
When using a CC-Link dedicated cable between GOT and PLC
GOT side
130
(5.12)
Within 230
(9.06)
When using a CC-Link dedicated cable between GOT and GOT
GOT side
130
(5.12)
Within 230
(9.06)
5) Ethernet Connection (Shielded twisted pair cable 10BASE-T)
• Strip the outer insulation layer at both ends of the cable by the length
shown below to expose the braided shield for grounding. (For
grounding with cable clamps. (refer to Section 5.6.3.))
GOT side
130
(5.12)
Within 230
(9.06)
6) PLC and microcomputer (manufactured by other company) connection
Produce the cable (RS-232C cable, RS-422 cable) for connecting the
GOT to a PLC or microcomputer (manufactured by other company) with
reference to the GOT-A900 Series User's Manual (Connection System
Manual).
Ferrite Core
(ZCAT3035-1330)
40
(1.57)
Ferrite Core
(ZCAT3035-1330)
40
(1.57)
Ferrite core
(ZCAT3035-1330)
40
(1.57)
PLC side
130
(5.12)
40
Within 400
(15.75)
(1.57)
130
(5.12)
40
Within 230
(9.06)
(1.57)
Ethernet module side
40
Within 400
(1.57)
(15.75)
34
Unit : mm (inch)
GOT side
Unit : mm (inch)
Unit : mm (inch)

Advertisement

Table of Contents
loading

Table of Contents